Healthcare Facilities
$500,000 – $1,000,000
CU Fitzsimons Improved Heating system, Phase 3
Contract With: | W. E. O’Neil Construction |
Owner: | CU Anschutz Facilities Management |
Removed existing steam risters that served each floor of the building. Installed one large central steam to heating hot water heat exchanger serving each foor with new heating hot water.
Denver Water Wellness Center
Contract With: | Rhinotrax |
Owner: | Denver Water Department |
Complete mechanical, plumbing and temperature control project for a new Wellness Center for Denver Water employees at their main campus.
Kaiser Permanente
Contract With: | JHL constructors |
Owner: | Kaiser Permenante |
JCOR was the mechanical prime contractor for a 40,000 sq ft build-out of a new medical clinic. Project included hot water heat with multiple VAV’s, RTU’s with DX cooling, DDC controls. Plumbing included new restrooms, multiple exam room fixtures, DI water, upsiziing gas and water entry, etc.
$1,000,000 – $2,500,000
VA ECHS Medical Center HVAC Upgrades & Mods
Contract With: | Department of Military Affairs |
Owner: | Department of Military Affairs |
Installed two roof top air handling units, seven air-cooled condensing units, four duct-mounted heating coils, six fan coils, and added a complex exterior ductwork enclosure while working in an occupied 24-hour hospital environment.
UCD CUP Expansion 4 Chiller
Contract With: | University of Colorado-Anschutz Medical Campus |
Owner: | UCD Central Utility Plant |
Added one chiller and two cooling towers with associated piping and equipment. Work included electrical, sheet metal, structural steel, roofing, insulation, test and balance, etc. Project was occupied during construction.