Denver Water Recycling Shower Upgrades

Contract With/Owner:

Contract:

Completion Year:

Denver Board of Water Commissioners   

$254,650

2013

Upgraded the existing safety shower system at the Denver Water Recycling Plant, Commerce City CO.  Included the installation of tempered water systems and flow detection alarm systems.