Correctional Facilities
Adams County Detention Facility Domestic Water Heater Replacement
Contract With/Owner: | Board of County Commissioners of Adams County, Colorado |
Contract Amount: | $606,350 |
Removal of domestic water heater and associated hot water storage tanks and re-installation of new domestic water heaters and hot water storage tanks and associated equipment.
Denver Women's Correctional Facility Steam Converter Replacement
Contract With/Owner: | State of Colorado by Department of Corrections |
Contract Amount: | $149,038 |
JCOR installed a complete plumbing system for the DWCF Culinary Arts Kitchen. Work was done while prison was occupied. Removed and replaced existing steam to domestic hot water generator.
Jefferson County Detention Center Phase 1 and 2 Grease Interceptor Replacements
Contract With/Owner: | Jefferson County Sheriff’s Office |
Contract Amount: | $265,802 |
Removed and replaced grease interceptor. Work included plumbing and ventilation systems. Work was completed while prison was occupied.
Boulder County Jail - Biomass Upgrade
Contract With/Owner: | Boulder County |
Contract Amount: | $488,944 |
Hooked up piping to a new owner-supplied biomass boiler. The boiler was installed in a new dedicated building which required us to run new hot water piping underground to the existing hot water system in the jail. Scope of work also included furnishing and installing two new chillers (one 200-ton and one 100-ton) with associated piping, pumps and VFDs. Furnished and installed two 6” reduced pressure backflow preventers at the main water entry.
Canon City CTCF Cell House #1 Critical Improvements
Contract With/Owner: | Department of Corrections |
Contract Amount: | $165,511 |
ADA restroom upgrades and remodel and ADA cell conversion renovations and expansion of restroom facilities. Work included plumbing and ventilation systems. Work was performed while prison was occupied.
Arkansas Valley Correctional Facility - Kitchen Drain Line
Contract With/Owner: | Department of Corrections |
Contract Amount: | $685,767 |
Replacement of over 1000’ of below-grade kitchen grease waste piping and sanitary waste piping. The majority of the existing cast iron pipe was replaced with stainless steel. Also included was the removal and replacement of concrete and tile. All work was completed while the kitchen was in use and occupied