Educational Facilities

Educational Facilities

Westridge HVAC AHU Replacement 2020

Contract With: Jefferson Co. School District
Owner: Jefferson Co. School District
Contraction Amount: $1,313,620

Removal and replacement of the air handling units.

DPS Samsonite High School Renovation

Contract With: Golden Triangle Construction
Owner: Denver Public Schools
Contraction Amount: $1,146.005

Removed and replaced most of the galvanized domestic water piping in the building and other miscellaneous plumbing.

DPS Marrama and Oakland Elementary Schools

Contract With: McKinstry Essention
Owner: Denver Public Schools
Contraction Amount: $812,445

In each of these schools, we replaced the two original heating hot water boilers with new high efficiency condensing boilers.  We also replaced the hot water system pumps with new pumps.

AIMS Community College Court - HVAC Upgrades Phases I & II

Contract With/Owner: Aims Community College
Contraction Amount: $761,987

Complete renovation of the entire mechanical system which included removing the entire dual duct system and replacing it with a single duct hot water VAV system.  Work included all major mechanical equipment with the associated piping and ductwork, structural steel modifications, temperature controls, test and balancing, and commissioning.  All work was completed while the college was occupied.

CU Stearns Fan Coil Replacement

Contract With/Owner: State of Colorado, University of Colorado, Boulder
Amount: $3,994,000

Replaced fan coil units in 375 rooms.  This short-timeframe project required extensive coordination and complex scheduling.  Work included electrical, temperature controls, replacing tile and HVAC.

Auraria Higher Education Center UPS & Cooling Unit

Contract With/Owner: Auraria Higher Education Center
Amount: $457,710

A mechanical prime project which included furnishing and installing a new UPS, Chillers, CRAC unit with all associated chilled water piping, structural support, roofing, temperature controls, insulation, electrical and balancing.