UCD CUP Expansion 4 Chiller

Contract With/Owner: University of Colorado – Anschutz Medical Campus Central Utility Plant
Contract Amount: $1,243,240

Scope included adding one chiller and two cooling towers with associated piping and equipment.  Work included electrical, sheet metal, structural steel, roofing, insulation, T&B, etc.  Project was occupied during construction.

UCD B500 Remedy Storm and Sanitation

Contract With: University of Colorado – Anschutz Medical Campus
Owner: State of Colorado
Contract Amount: $281,170

Furnished and Installed cross connections, (2) Sump pumps and steam vent. JCOR was the prime contractor.

Kaiser Permanente – Castle Rock

Contract With: JHL Constructors
Owner: Kaiser Permanente
Contract Amount: $757,000

JCOR was the mechanical prime contractor for a 40,000 square foot TI build-out of a new medical clinic. Project included hot water heat with multiple VAV’s, RTU’s with DX cooling, DDC controls by Long & Associates, etc. Plumbing included new restrooms, multiple exam room fixtures, DI water, upsizing gas and water entry, etc.

UCD Utility Vault 3.2 Emergency Replacement

Contract With/Owner: University of Colorado – Anschutz Medical Campus
Contract Amount: $207,350

Phase #1 – Demo’d existing steam vault and replaced steam, condensate, chilled water supply and chilled water return piping with new pre-insulated piping.

Phase #2 – Removed and replaced steam and condensate lines to Buildings 401 and 402.

UCD Bldg 400 Steam

Contract With/Owner: University of Colorado – Anschutz Medical Campus
Contract Amount: $359,220

Re-route steam to 400 Series Buildings.

VA ECHS Medical Center - HVAC Upgrades and Modifications

Contract With/Owner: Department of Veterans Affairs
Contract Amount: $1,303,048

Installed two rooftop air handling units, seven air-cooled condensing units, four duct-mounted heating coils, six fan coils, and the addition of a complex exterior ductwork enclosure in a 24-hour working hospital environment.