Correctional Facilities
Canon City CTCF Cell House #1 Critical Improvements
Contract With/Owner: | Department of Corrections |
Contract Amount: | $165,511 |
Completion Year: | 2012 |
ADA restroom upgrades and remodel and ADA cell conversion renovations and expansion of restroom facilities. Included plumbing and ventilation systems. Work was done while the prison was occupied.
Arkansas Valley Correctional Facility – Kitchen Drain Line
Contract With/Owner: | Department of Corrections |
Contract Amount: | $685,767 |
Completion Year: | 2010 |
Replacement of over 1000’ of below-grade kitchen grease waste piping and sanitary waste piping. The majority of the existing cast iron pipe was replaced with stainless steel. Also included was the removal and replacement of concrete and tile. All work was completed while the kitchen was in use and occupied.
Limon Correctional Facility – Domestic Water Line
Contract With/Owner: | Department of Corrections |
Contract Amount: | $339,017 |
Completion Year: | 2008 |
Replacement of approximately 800’ of below-grade kitchen grease waste piping and sanitary waste piping. The majority of the existing cast iron pipe was replaced with stainless steel. Also included was the removal and replacement of concrete and tile. All work was completed while the kitchen was in use and occupied.
Boulder County Jail – Biomass Upgrade
Contract With/Owner: | Boulder County |
Contract Amount: | $488,944 |
Completion Year: | 2011 |
Hooked up piping to a new owner-supplied biomass boiler. The boiler was installed in a new dedicated building which required us to run new hot water piping underground to the existing hot water system in the jail. Scope of work also included furnishing and installing two new chillers (one 200-ton and one 100-ton) with associated piping, pumps, and VFDs. Furnished and installed two 6” reduced pressure backflow preventers at the main water entry.
Arkansas Valley Correctional Facility – Domestic Water Repairs
Contract With/Owner: | Department of Corrections |
Contract Amount: | $380,800 |
Completion Year: | 2009 |
Domestic Water Distribution Repairs - 6 Buildings: Rerouted all underfloor piping mains to above grade and ran new water distribution piping in 6 active jail houses.
City & County of Denver - Denver Jail
Contract With/Owner: | City and County of Denver |
Contract Amount: | $132,877 |
Completion Year: | 2002 |
Hot water upgrades