OLD – Correctional Facilities

Correctional Facilities

Canon City CTCF Cell House #1 Critical Improvements

Contract With/Owner: Department of Corrections
Contract Amount: $165,511
Completion Year: 2012

ADA restroom upgrades and remodel and ADA cell conversion renovations and expansion of restroom facilities. Included plumbing and ventilation systems. Work was done while the prison was occupied.

Arkansas Valley Correctional Facility – Kitchen Drain Line

Contract With/Owner: Department of Corrections
Contract Amount: $685,767
Completion Year: 2010

Replacement of over 1000’ of below-grade kitchen grease waste piping and sanitary waste piping. The majority of the existing cast iron pipe was replaced with stainless steel. Also included was the removal and replacement of concrete and tile. All work was completed while the kitchen was in use and occupied.

Limon Correctional Facility – Domestic Water Line

Contract With/Owner: Department of Corrections
Contract Amount: $339,017
Completion Year: 2008

Replacement of approximately 800’ of below-grade kitchen grease waste piping and sanitary waste piping. The majority of the existing cast iron pipe was replaced with stainless steel. Also included was the removal and replacement of concrete and tile. All work was completed while the kitchen was in use and occupied.

Boulder County Jail – Biomass Upgrade

Contract With/Owner: Boulder County
Contract Amount: $488,944
Completion Year: 2011

Hooked up piping to a new owner-supplied biomass boiler. The boiler was installed in a new dedicated building which required us to run new hot water piping underground to the existing hot water system in the jail. Scope of work also included furnishing and installing two new chillers (one 200-ton and one 100-ton) with associated piping, pumps, and VFDs. Furnished and installed two 6” reduced pressure backflow preventers at the main water entry.

Arkansas Valley Correctional Facility – Domestic Water Repairs

Contract With/Owner: Department of Corrections
Contract Amount: $380,800
Completion Year: 2009

Domestic Water Distribution Repairs - 6 Buildings: Rerouted all underfloor piping mains to above grade and ran new water distribution piping in 6 active jail houses.

City & County of Denver - Denver Jail

Contract With/Owner: City and County of Denver
Contract Amount: $132,877
Completion Year: 2002

Hot water upgrades