OLD – Educational Facilities

Educational Facilities

DPS Lincoln Boiler Replacement and Science lab renovations

Contract With: Mark Young Construction
Owner: Denver Public Schools
Contract Amount: $1,289,909
Completion Year: 2015

Furnished and installed (3) 6 million BTU hot water boilers. Work included the associated piping, flue, controls and insulation. JCOR renovated the mechanical and plumbing systems in the science classrooms. Included new mechanical equipment and all acid waste and vent, natural gas, and domestic hot and cold water, and fume hood exhaust.

East High YCC Plumbing and Mechanical

Contract With: Mark Young Construction
Owner: Denver Public Schools
Contract Amount: $95,204
Completion Year: 2015

JCOR performed the plumbing and mechanical work for the new robotics lab at East HS.

DPS Lincoln Pool Renovation

Contract With/Owner Denver Public Schools
Contract Amount: $313,760
Completion Year: 2014

Renovate Pool Piping and Equipment at Abe Lincoln High School.

UCD CUP Expansion 4 Chiller

Contract With/Owner State of Colorado, University of Colorado
Contract Amount: $1,243,240
Completion Year: 2013

Scope included adding one chiller and two cooling towers with associated piping and equipment. Work included electrical, sheet metal, structural steel, roofing, insulation, T&B, etc. Occupied during construction.

CU Stearns West Restroom Renovation

Contract With/Owner State of Colorado, University of Colorado
Contract Amount: $125,148
Completion Year: 2013

Plumbing for renovation of 27 student restrooms in the dormitory. Re-piped and replaced all of the fixtures.

CU Stearns Tower Mechanical Upgrades

Contract With/Owner Colorado University Boulder
Contract Amount: $238,052
Completion Year: 2011

Fast tracked project which included installing approximately 300 shutoff valves on the chilled and hot water risers serving residence towers at Williams Village. Project also included replacing 12 fan coil units.

UCB – Smart Grid Steam Meter Project

Contract With/Owner Colorado University Boulder
Contract Amount: $376,877
Completion Year: 2011

Pilot program for a campus-wide sub-metering program. Installed various sizes of high-pressure steam, electrical and domestic water meters. All meters were tied into the campus communication system enabling the meters to be read remotely from a central location.

Wheat Ridge Middle School Improvements

Contract With: M. W. Golden
Owner: Jefferson County School District
Contract Amount: $286,003
Completion Year: 2010

Installed new owner-provided chiller and a cooling tower with associated piping and six new pumps.

Crown Point Academy (Charter School)

Contract With/Owner: JHL Constructors
Contract Amount: $32,405
Completion Year: 2010

A new ground up 45,000 square-foot elementary charter school. JCOR assisted in the design and built the new plumbing systems.

Crown Point Academy (Charter School)

Contract With/Owner: JHL Constructors
Contract Amount: $32,405
Completion Year: 2010

A new ground-up 45,000 square-foot elementary charter school. JCOR assisted in the design and built the new plumbing systems.

AIMS Community College Court – HVAC Upgrades Phases I & II

Contract With/Owner: Aims Community College
Contract Amount: $761,987
Completion Year: 2009

Complete renovation of the entire mechanical system which included removing the entire dual duct system and replacing it with a single duct hot water VAV system. Included all major mechanical equipment with the associated piping and ductwork, structural steel modifications, temperature controls, test and balancing, and commissioning. All work was completed while the school was occupied.

Rocky Ford High School Mechanical Upgrades

Contract With Walrath Heating & Air Conditioning
Owner: Rocky Ford School District
Contract Amount: $258,179
Completion Year: 2007

Various mechanical and energy-efficient upgrades including instantaneous water heaters, heating water pumps, rerouting heating water mains, and repiping air handling coils.

Thomas Jefferson, McKinley-Thatcher, Smiley Middle School – Complete HVAC Retrofit

Contract With Brown Schrepferman Construction
Owner: Denver Public Schools
Contract Amount: $1,245,480
Completion Year: 2006

New steam boiler, 3 high-efficiency hot water heaters, temperature control retrofit from pneumatic to DDC; replaced existing chiller with 135-ton chiller and associated pumps and equipment.

Montclair Elementary School Steam Boilers

Contract With/Owner: Denver Public Schools
Contract Amount: $219,700
Completion Year: 2006

Replaced two steam boilers at Montclair Elementary.

South High Water Heater Replacement

Contract With/Owner: Denver Public Schools
Contract Amount: $133,520
Completion Year: 2005

Replaced the existing steam to the hot water heat exchanger, removed existing 1500 gallon hot water storage tank, and replaced with three high-efficiency Aerco water heaters.

CSM Mechanical Upgrade

Contract With/Owner: Colorado School of Mines
Contract Amount: $126,157
Completion Year: 2005

Chilled Water Distribution -- Added chilled water piping, pumps, and coils to six existing air handlers.

CU-Boulder – Newton Court

Contract With/Owner: University of Colorado
Contract Amount: $145,785
Completion Year: 2002

Boiler retrofit.

East High School Boiler Replacement and Science Lab Renovation

Contract With: Mark Young Construction
Owner: Denver Public Schools
Contract Amount: $1,182,818
Completion Year: 2015

Removed (3) existing steam boilers and replaced them with (4) new 4.8 million BTU steam boilers. Work included new piping, flue, controls and insulation. JCOR renovated the mechanical and plumbing systems in the science classrooms. Included new mechanical equipment and all acid waste and vent, compressed air, natural gas, and domestic hot and cold water, and fume hood exhaust

CU Williams Village Grey Water

Contract With/Owner State of Colorado, University of Colorado
Contract Amount: $107,250
Completion Year: 2015

Installed gray water recirculation system at Village North residence hall.

UCD Bldg 400 Steam

Contract With/Owner State of Colorado, University of Colorado
Contract Amount: $359,220
Completion Year: 2014

Re-route steam to 400 Series Buildings

UCD Utility Vault 3.2 Emergency Replacement

Contract With/Owner State of Colorado, University of Colorado
Contract Amount: $207,350
Completion Year: 2014

Plumbing for renovation of 27 student restrooms in the dormitory. Re-piped and replPhase #1 – Demo’d existing steam vault and replaced steam, condensate, chilled water supply and chilled water return piping with new pre-insulated piping.

Phase #2 – Removed and replaced steam and condensate lines to Buildings 401 and 402. aced all of the fixtures.

CU Stearns Fan Coil Replacement

Contract With/Owner State of Colorado, University of Colorado
Contract Amount: $207,350
Completion Year: 2014

Replaced fan coil units in 375 rooms. This short-timeframe project required extensive coordination and complex scheduling. Work included electrical, temperature controls, replacing tile and HVAC.

Highline Academy (Charter School)

Contract With/Owner JHL Constructors
Contract Amount: $278,222
Completion Year: 2011

40,000 square foot charter school. The school took possession of an old General Motors Test Facility. JCOR assisted in the design build of the plumbing systems.

Green Mountain High School Boiler Replacement

Contract With/Owner Jefferson County School District
Contract Amount: $114,985
Completion Year: 2011

Furnished and installed two new 2,000,000 BTU boilers with the associated welded piping, pumps, flue, piping, electrical controls and insulation.

North Star Academy (Charter School)

Contract With/Owner JHL Constructors
Contract Amount: $314,518
Completion Year: 2010

A new design-build 40,000 square foot charter school. The school took possession of an out-of-business 80,000 square foot hardware retail box store. A new elementary school was built in half of the building. JCOR assisted in the design and built the plumbing systems.

Monarch Montessori (Charter School)

Contract With/Owner JHL Constructors
Contract Amount: $181,578
Completion Year: 2010

A new 15,000 square foot Montessori school. The school took possession of a portion of the existing office space. JCOR assisted in the design of and built the new plumbing systems. In addition, JCOR troubleshot and repaired the existing heating and cooling systems to get them working properly for the entire building.

Auraria Higher Education Center UPS & Cooling Unit

Contract With/Owner Auraria Higher Education Center
Contract Amount: $457,710
Completion Year: 2009

A mechanical prime project which included furnishing and installing a new UPS, Chillers, CRAC unit with all associated chilled water piping, structural support, roofing, temperature controls, insulation, electrical and balancing.

CU MSSC RL-6 Air Handling & Cooling Retrofit

Contract With/Owner: University of Colorado, Boulder
Contract Amount: $329,714
Completion Year: 2008

Furnished and installed a new 100-ton chiller and AHU with all associated chilled water piping, structural support, roofing, temperature controls, ductwork, insulation, electrical, and balancing.

Deer Creek, Manning, & Stober Schools – Grease Interceptors

Contract With/Owner: Jefferson County Public School District
Contract Amount: $148,500
Completion Year: 2007

Separated grease waste from the sanitary waste inside the kitchen area, ran grease waste through new grease interceptors and tied back into the existing sanitary.

UNC Michener Hall Cooling Tower Replacement

Contract With/Owner: University of Northern Colorado
Contract Amount: $120,500
Completion Year: 2006

Replaced and upgraded the existing cooling tower.

Holm, Henry & Dennison Public Schools – Mechanical Retrofit

Contract With: J.L. Williams
Owner: Denver Public Schools
Contract Amount: $434,146
Completion Year: 2006

Installed new burners on the existing steam boilers, refurbished the existing cooling towers, installed backflow prevention at the water entry, and upgraded the pneumatic controls to DDC at Dennison.

East High School and Lake Middle School – Boiler Burner Replacement

Contract With/Owner: Denver Public Schools
Contract Amount: $314,830
Completion Year: 2005

Hydronic System Replacement Hydronic system tie-in.

CU Marine Court – Hydronic System Replacement

Contract With/Owner: University of Colorado
Contract Amount: $118,000
Completion Year: 2005

Hydronic System Replacement Hydronic system tie-in.